End of the week, work week.

Thursday and Friday of last week we did some work over at a large greenhouse complex.  We were doing some slab prep for a large ramp/ loading dock in a massive temp structure.  This structure  could house 2 to 3 football fields, and they want to expand it.

This structure was built for sawdust.  The reason why they have so much sawdust is when the energy prices went up they changed to a system where they burn their own sawdust to create heat.  They have these massive heaters that they load with a large front end loader and burn the sawdust.

Here are some shots I took while I was there.